Partner project · Solar and storage

Jiangsu solar and storage.

A partner installation in Jiangsu pairs rooftop solar with 20 solid-state battery cabinets.

2 MWhReported battery capacity
20 cabinets100 kWh per cabinet
JiangsuChina
Aerial view of rooftop solar arrays at the Jiangsu project site

The installation

Solar generation, integrated into the site.

The installation at the Jiangsu Provincial Government Talent Exchange Center combines photovoltaic generation and on-site battery storage.

The equipment used

The project uses 20 standalone solid-state battery cabinets rated at 100 kWh each. The reported storage system rating is 1 MW / 2 MWh.

Explore solid-state batteries

Project figures and photography come from the project partner’s published case study.

Another installation

Suzhou commercial rooftop.

Your next project

Tell us about your site.

Contact our team ↗